November 5, 2026
A frayed conveyor belt edge almost always gets blamed on the belt. In practice, on BM2000/58 road milling machines the belt is the last component in a chain that starts with one seized roller on the return strand. The belt cannot run straight over a roller that has stopped turning, so it climbs to one side, abrades against the frame, and only then does anyone notice the damage.
That sequence matters commercially. A belt is a significantly more expensive part than a triple idler set, and by the time the fray is visible the belt has usually absorbed weeks of unnecessary edge wear. Replacing the roller set at the first sign of tracking drift is the cheaper intervention, and it is the one that keeps the machine on the cut.
The 90117 / 190358 set carries all three rollers on one bracket frame, matched and set at the same centres. That has two practical consequences for a maintenance team.
Sealed bearing ends keep grit and wash water out of the bearing cavity, which is where idler seizure starts. The bracket is sized for the return strand load so it does not flex under belt tension, and the three rollers spread the belt weight instead of concentrating it on one contact point.
| Product Name | Conveyor Belt Triple Idler Roller Set |
| Part Numbers | 90117 / 190358 |
| Brand | APOLLO |
| Applicable Model | BM2000/58 road milling machine |
| Installed On | Conveyor system, return strand |
| Function | Supports and aligns the conveyor belt |
| Set Contents | 3 rollers on 1 bracket frame |
| Material | Steel roller shells with sealed bearing ends |
| Condition | 100% New |
| Minimum Order | 1 set |
| Price | USD 188 per set |
| Delivery | 7-15 days after payment |
| Payment Terms | L/C, T/T |
| Supply Ability | 1000 pcs per month |
Lock out the conveyor, release belt tension and support the frame before the bolts come out, then undo the mounts evenly so the bracket does not spring. Clean the mounting faces, seat the set, torque in a cross pattern, re-tension the belt and run the conveyor empty for several minutes to confirm tracking before loading material.
Sets ship from stock at a minimum order of one set, packed in carton or on pallet, dispatched 7-15 days after payment and payable by L/C or T/T. Monthly capacity is 1000 pieces. Send the machine serial and a photograph of the existing conveyor frame and the parts team will confirm the layout before shipment.
Part numbers are listed for cross-reference only and do not imply original equipment manufacture.